Skip to content
The Building Atlas

Building fingerprint

PEPCO Northeast Substation

L-Shaped Unincorporated areabead5cc2-4bc8-4864-8a13-b340f77c509d

Drawing the atlas

Footprint

20,659

square feet of roof

Perimeter

608 ft

Compactness

0.70

compact

Vertices

7

faceted outline

Aspect

1.12 : 1

square-ish

Height

15.5 m

51 ft modelled

Class

—

unclassified

Size rank in Unincorporated area

top 1%

Larger than 99.0% of the buildings in Unincorporated area.

Geometry from the building footprint alone — no owner records, no listings.

Location

Where this building sits

101 Harry Thomas Way Northeast

Washington, District of Columbia 20002

Coordinates
38.910427, -77.002056
38°54'37.5"N 77°00'07.4"W
County
District of Columbia
Metro area
Washington-Arlington-Alexandria, DC-VA-MD-WV Metro Area
Census tract
Census Tract 87.02
Bounding box
188 × 186 ft

Doppelgängers

Buildings that share this fingerprint

Same shape class, footprint within ±15%, ranked by how close the compactness is. The nearest matches within a few miles.

More unusual shapes